| The $20 FT |
So if you read that title, what you're probably expecting to see is nothing all that special. While I can say that the bachmann model is definitely not the ideal FT model to begin with. That shared wheelbase and chassis from the F7 series isn't exactly prototypical. I had one of these in high school in warbonnet, or at least the horrible rendition of warbonnet Bachmann had the gall to say looked "Ok". It ended up in the scrap pile a LONG time ago, replaced by much more prototypical models as my skills and efforts to be prototypical improved.
Fast forward to the TCA show in Denver, March of 2016. I was in the middle of college at the time, not too much money going around, I told myself I wasn't going to buy anything while I was at the show. Primarily I was going to spend my time running trains on the Colorado Rail Link layout. Well, there's been a trend when I bring stuff to run at TCA, people become interested in the cars I've already done work to and make offers for stuff I bought. Long story short, I ended up selling some things I hadn't intended to sell. This left me with some cash to walk around the show with. Now this particular show right across from the layout was a vendor who had what I would call a junk stand. From a distance it looks like a hodgepodge of anything model related that could be considered a train. Many scales, mostly older, cheaper things. Normally I give this booth a walk through, because occasionally you can find good items mixed in, or kitbashing fodder.
Remember the FT with the god awful paint job I mentioned above? Well, as I walked through the dealer's display, there was an FT that caught my eye. At first glance, the paint made it look like it should be a Stewart or an Intermountain piece, but on closer inspection, it's a bachmann model. Price tag stuck to it says $15. Now, I've wanted an FT for some time, and at that point in history before I started working as an engineer, Money was not something I had a lot of. So $15 for an FT? Why not, paint was good, bachmann certainly had stepped up the game here. I had bachmann F unit chassis before that were good drives, paired to shells with poor quality. It ran good on the little test track, so I bought it, took it back over to rail link, and ran it. At the time, I thought about getting a B unit to go with it, maybe another A..... but it would have to wait until I could afford to do so.
Upon returning home, I looked through my library of research material I have for the Santa Fe. One image that came back up was for an FT that had been equipped with footboards on the front. Upon closer inspection it had a headlight on the rear as well. I was intrigued and set about to find out more about this, eventually finding photos of 405 in Texas switching with fore and aft pilot boards and a backup light. At this point, I knew what I was going to do with my FT.
Switcher FT, Mark I
So I knocked together the first iteration of the FT in one night over Spring Break. it was a rather crude invention, at the time I didn't have decals to number it yet, so two square holes in the carbody led straight over to the frame on the inside, I planned to just decal the frame. In the back of the unit glued to the carbody on top was a piece of styrene tube with an SMD LED stuck in it for the backup light. In the front of the unit, two pieces of stripwood were glued to the pilot to make the front running boards, there were no brackets. In the rear, some styrene had been cobbled together to make the running boards for the back of the unit. A spare partially burnt DZ125 decoder was installed in the unit as well. It certainly wasn't the prettiest thing to ever grace the club layout, however it was a decent "stand in" given the current budget during College. I ran the unit quite a bit, the running boards had a tendency to just fall off and the backup light was wayyyy too small to be prototypical. One of the last things this version got was I found a spare Details West F unit door in the parts bin from an older project, so I hacked up the end of the bachmann unit and the Mark 1.5 veresion of the FT came into play, it looked much better than the stock end of the unit when switching.
Switcher FT, Mark II
Not too much later, it was May of 2016, college was letting out for the Summer, and I was looking for a job. I ended up getting hired as an engineer on the Pikes Peak Cog Railway, and compared to my original minimum wage fast food and grocery store jobs of yore, I had money to put towards modeling. However during the tourist season, this meant no time to work on models. During the summer I purchased an ABBA of stewart FT's, getting the authentic lashup I wanted. However, so much as it tempted me to find a single Stewart or Intermountain A unit to replace the bachmann, my sentimentality made me end up keeping it.
I purchased Microscale decals to number the stewart FT's and also went ahead and cut out the hole in the bachmann shell to match the side numberboards on the stewarts. The bachmann FT got numbered as well, gaining the number 405. I also fabricated new running boards out of styrene and stripwood for the front, giving a more proto look, and also re-enforcing the running boards so they wouldn't fall off anymore. I also purchased a Cal-Scale backup light that was appropriate for the real ones the FT switchers had. It was installed in place of the styrene tube. The rear running boards were re-designed, and again installed. This worked out pretty well during the summer, but I wasn't 100% happy with it.
Switcher FT, Mark III (current)
So here we are, its October of 2016. What else have I done to the unit? Well, the Mark III upgrade occurred in August of 2016, mostly as a tidy up of previous work. The rear running board came off for yet another re-design, it kept falling off. I created new styrene inserts for the numberboards on the sides and moved the numbers closer to the side of the carbody. The bachmann shell was so thick, that with the old method of the numbers being on the frame, you couldn't see the numbers unless you looked staight on from the side. Eventually this will also get a frame around it to match the stewarts. I also did some drivetrain improvements, the contacts in the trucks were replaced with new wire ones, and they were hardwired to the decoder, no longer does the unit use it's frame to conduct power. This about brings us to the current point of the project.
![]() |
| Fireman's Side long shot. |
Looking down the firemans Side of the FT. You can see my running boards on the front and the numberboard on the nose that was fabricated from styrene.
![]() |
| Rear of the FT |
Looking at the rear of the FT, showing off the details west door and cal scale headlight. Minus my running board thats out service.
![]() |
| Engineers side, missing some decals I see... |
![]() |
| The drive next to the shell. |
A shot of the shell sitting next to the frame, you can see the old frame attached decals on the frame, and the new styrene ones on the shell. This rats nest is going to be cleared out when the lokpilot goes in.
So there we have it, if you count actual money spent on the unit at this point, we're sitting at around $20. Most parts came out of the scrap bin or from older project. Still to do is to order some dynamic brake blower boxes from Stewart, install the rear running boards again, and a crew to add.
Stay tuned for part 2 when the above gets finished and then we take it out for another test drive.
-Jimmy